Shopping Mall Car Park - 12 x 120 kW DC

Shopping Mall Car Park - 12 x 120 kW DC
12 bays120 kW each36 months

Site background

A regional shopping centre in South East Asia needed destination charging that would keep shoppers on site longer, on a car park supply that had very little spare capacity.

The challenge

The available import at the car park substation was well below what 12 simultaneous 120 kW chargers would draw, and the operator would not fund a substation upgrade.

Solution

  • Twelve dual-gun 120 kW all-in-one DC stations, CCS2 and GBT connectors
  • Dynamic power allocation capping site import at the contracted level
  • Battery-buffered units at four bays to absorb peak demand
  • RFID and QR payment integrated with the mall loyalty platform

Implementation

1Site survey and load study
2Phased installation over 6 weeks
3Commissioning and OCPP back-office handover

Outcome

  • 12 DC bays operational without a substation upgrade
  • Average session 34 minutes, dwell time up 18%
  • Site import stayed within the contracted capacity through the first summer peak